PARKER
Electrical · EV Charging · Port St. Lucie

EV charging at home, done to code.

A Level 2 charger is a new 240-volt circuit — real electrical work with permits and inspection. Parker coordinates it through licensed electrical partners: panel assessed first, price in writing, work permitted, and the install logged in your home's record.

Request this service

What Parker handles.

Panel capacity assessment before anything is promised
NEMA 14-50 outlet and hardwired Level 2 charger circuits
Tesla Wall Connector and universal charger installations
Permitting and inspection handled by the licensed partner
Garage and exterior mounting with weather-rated equipment
Honest guidance when a panel upgrade is needed first

Standard 240V outlet priced flat in the catalog. Panel work, if needed, quoted in writing first.

Why people request through Parker.

The EV charger install market is full of quotes made sight-unseen — and change orders the day of the work, because no one looked at the panel first. Parker runs it in the correct order: the standard 240V outlet installation carries a flat catalog price, and the panel is confirmed before scheduling, so the number you book is the number you pay.

Every EV circuit Parker coordinates is performed by a licensed electrical partner who pulls the permit and meets inspection — this is not handyman work, and Parker never treats it as such. Parker manages the scope, the schedule, and the documentation; the licensed partner brings the license and the trade.

The panel check matters because the answer differs house to house: a 200-amp panel with headroom takes a charger easily; a fully-loaded panel may need a load-management device or an upgrade first — and that work, when needed, is quoted separately in writing. You'll know which house you own before you commit to anything.

How it works.

01

Tell Parker about your car and your panel

The charger you have or plan to buy, and a photo of the electrical panel if it's handy. That's enough to start.

02

Assessment and a written quote

A licensed electrical partner confirms panel capacity and routing, and Parker delivers one written price — no day-of surprises.

03

Permitted install, documented

The circuit is installed, permitted, and inspected by the licensed partner. The equipment and install details go into your home's record.

Common questions.

Begin with Parker.

One request, one trusted relationship, one record of the work. Available across St. Lucie County.

From the catalog

Flat pricing, visible before you book.

Current catalog prices — parts of the visit and labor included as described, and the price you see is the price you approve.

EV Charger Outlet Installation — 240V
Install one 240V/50A dedicated outlet (NEMA 14-50) for electric vehicle charging. Includes outlet, wiring from panel (up to 25 ft), and breaker.
$695
Book →
Generator Inlet Box Installation
Install a 30A generator inlet box with interlock kit connection point. Allows safe portable generator hookup during hurricane season. Does not include transfer switch.
$595
Book →
Generator Inlet Box Installation
See Electrical section — install 30A generator inlet box.
$595
Book →